angleško » nemški

Prevodi za „Transition Piece“ v slovarju angleško » nemški

(Skoči na nemško » angleški)

Primeri iz spleta (nepregledani od uredništva PONS)

Unsere Windmessmasten sind in 2 Höhen, 100m und 120m, lieferbar und für alle Fundamenttypen am Standorte im Nord- und Ostsee geeignet.

Windmessmast komplett mit Leiter , Arbeitsplattformen , Ausleger , Blitzschutz und Kabelführung ; Transition Piece und Plattform auch lieferbar

Messtechnik für Windmessungen nach IEC 61400-12, inkl. Windgeschwindigkeit, Windrichtung, Temperatur, Luftdruck, Luftfeuchtigkeit und sonstige MetOcean-Daten

www.airwerk.com

Our wind measurement masts are available in two heights, 100m and 120m, and are suitable for all foundation types used for locations in the North and Baltic Seas.

Wind measurement mast including ladders , working platforms , booms , lightning protection and cable routing ; transition piece and platform can also be supplied

Measurement equipment for wind measurements in accordance with IEC 61400-12, including wind speed, wind direction, temperature, barometric pressure, humidity and other MetOcean data

www.airwerk.com

Diese Übergangsstücke werden zum Ausrichten des eigentlichen Windturmes benötigt.

Jedes Transition Piece wiegt circa 300 t. Walney löst bei seiner Eröffnung den englischen Windpark Thanet als leistungsstärksten Offshore-Windpark ab , für den Dillinger Hütte GTS ebenfalls ca. 46.300 t Bleche für die Monopiles geliefert hat .

www.dillinger.de

Transition pieces, needed for installation and alignment of the wind tower itself, and each weighing close to 300 t, are then mounted on the monopiles.

Upon its inauguration, Walney immediately took over from another English wind farm, Thanet - for the monopiles of which Dillinger Hütte GTS also supplied around 46,300 t of heavy plate - as the world s highest-output offshore wind farm.

www.dillinger.de

01.07.2013 Wichtiger Meilenstein für Projekt Meerwind

Bei AMBAU in Cuxhaven hat das letzte Transition Piece die Werkhalle verlassen / Lieferung aller Fundamente für das Projekt Meerwind Süd │ Ost komplett

Pressemitteilung

ambau.com

01.07.2013 Major Milestone in the Meerwind Project

The last transition piece dispatched from AMBAU Cuxhaven manufacturing hall – All Meerwind Süd | Ost project foundations delivered

Press release

ambau.com

Primeri iz spleta (nepregledani od uredništva PONS)

Our wind measurement masts are available in two heights, 100m and 120m, and are suitable for all foundation types used for locations in the North and Baltic Seas.

Wind measurement mast including ladders , working platforms , booms , lightning protection and cable routing ; transition piece and platform can also be supplied

Measurement equipment for wind measurements in accordance with IEC 61400-12, including wind speed, wind direction, temperature, barometric pressure, humidity and other MetOcean data

www.airwerk.com

Unsere Windmessmasten sind in 2 Höhen, 100m und 120m, lieferbar und für alle Fundamenttypen am Standorte im Nord- und Ostsee geeignet.

Windmessmast komplett mit Leiter , Arbeitsplattformen , Ausleger , Blitzschutz und Kabelführung ; Transition Piece und Plattform auch lieferbar

Messtechnik für Windmessungen nach IEC 61400-12, inkl. Windgeschwindigkeit, Windrichtung, Temperatur, Luftdruck, Luftfeuchtigkeit und sonstige MetOcean-Daten

www.airwerk.com

01.07.2013 Major Milestone in the Meerwind Project

The last transition piece dispatched from AMBAU Cuxhaven manufacturing hall – All Meerwind Süd | Ost project foundations delivered

Press release

ambau.com

01.07.2013 Wichtiger Meilenstein für Projekt Meerwind

Bei AMBAU in Cuxhaven hat das letzte Transition Piece die Werkhalle verlassen / Lieferung aller Fundamente für das Projekt Meerwind Süd │ Ost komplett

Pressemitteilung

ambau.com

Bi želeli dodati besedo, frazo ali prevod?

Predlagajte nov vnos.

Stran Deutsch | Български | Ελληνικά | English | Español | Français | Italiano | Polski | Português | Русский | Slovenščina | Srpski | Türkçe | 中文